Colorado road construction · CO-94
CO-94 construction in Colorado today
Every CDOT work zone on CO-94 in Colorado today: lane closures, full closures, which direction and how long each lasts.
2 work zones · 0 full closures · updated every 15 minutes
- One lane, alternatingWestboundBetween County Road 2B and County Road 11 (19 to 24 miles east of the Ellicott area) from Mile Point 38 to Mile Point 43. Paving operations. Alternating traffic. Width limit in effect. Width limit 12'0". Starting Monday at 7:00AM MDT until Monday, at about 6:00PM MDT. Full schedule below: • November 2, 7:00AM - November 2, 6:00PM Comment: Speed reduced to 40 mph and up to 15-minute delays. For mor (CO-94)from Mon, Nov 2, 9:00 AM, until Nov 2
- One lane, alternatingEastboundBetween County Road 2B and County Road 11 (19 to 24 miles east of the Ellicott area) from Mile Point 38 to Mile Point 43. Paving operations. Alternating traffic. Width limit in effect. Width limit 12'0". Starting Monday at 7:00AM MDT until Monday, at about 6:00PM MDT. Full schedule below: • November 2, 7:00AM - November 2, 6:00PM Comment: Speed reduced to 40 mph and up to 15-minute delays. For mor (CO-94)from Mon, Nov 2, 9:00 AM, until Nov 2
Other Colorado highways
From the Colorado Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from CDOT.
Driving CO-94?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit