Indiana road construction · US-231
US-231 construction in Indiana today
Every INDOT work zone on US-231 in Indiana today: lane closures, full closures, which direction and how long each lasts.
16 work zones · 0 full closures · updated every 15 minutes
- Work zoneSouthboundRoad Closure, Road Construction, Detour In Operation (US 231)until Nov 18
- Work zoneNorthboundGas Main Work (US 231)until Aug 12
- Work zoneSouthboundGas Main Work (US 231)until Aug 12
- Work zoneSouthboundUtility Work (US 231)until Nov 20
- Work zoneNorthboundClosed (US 231)from Mon, Nov 2, 6:00 AM, until Nov 13
- Work zoneSouthboundWater Main Work (US 231)until Nov 27
- Work zoneNorthboundWater Main Work (US 231)until Nov 27
- Lanes closedSouthboundConstruction Work, Reduced To One Lane, Temporary Traffic Lights (US 231)until Nov 3
- Lanes closedSouthboundUtility Work, Lane Closed (US 231)until Dec 1
- Work zoneNorthboundUtility Work (US 231)until Nov 20
- Lanes closedNorthboundConstruction Work, Reduced To One Lane, Temporary Traffic Lights (US 231)until Nov 3
- Work zoneNorthboundRoad Closure (US 231)until Nov 6
- Work zoneSouthboundRoad Closure (US 231)until Nov 6
- Lanes closedNorthboundUtility Work, Lane Closed (US 231)until Dec 1
- Work zoneSouthboundClosed (US 231)from Mon, Nov 2, 6:00 AM, until Nov 13
- Work zoneNorthboundRoad Closure, Road Construction, Detour In Operation (US 231)until Nov 18
Other Indiana highways
From the Indiana Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from INDOT.
Driving US-231?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit