Kentucky road construction · US-45
US-45 construction in Kentucky today
Every KYTC work zone on US-45 in Kentucky today: lane closures, full closures, which direction and how long each lasts.
2 work zones · 0 full closures · updated every 15 minutes
- Work zoneNorthboundUS-45 at MM 1.8 in Graves Countyuntil Dec 31
- Work zoneSouthboundUS-45 South between MM 7.8 and 7.4 in McCracken Countyuntil Nov 4
Other Kentucky highways
From the Kentucky Transportation Cabinet's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from KYTC.
Driving US-45?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit