Texas road construction · US-83
US-83 construction in Texas today
Every TxDOT work zone on US-83 in Texas today: lane closures, full closures, which direction and how long each lasts.
As of 11/02/2026 at 10:37 PM CST · 19 work zones · 2 full closures · updated every 15 minutes
- One lane, alternatingSouthbound- Alternating lanes closed.<br/>- Watch for flag personnel directing traffic.<br/><br/><br/>Watch for heavy traffic as the US 83/277 through traffic is detoured to the frontage roads in this area for bridge construction. (BU 83D)until Nov 30
- One lane, alternatingNorthbound- Alternating lanes closed.<br/>- Watch for flag personnel directing traffic.<br/><br/><br/>Watch for heavy traffic as the US 83/277 through traffic is detoured to the frontage roads in this area for bridge construction. (BU 83D)until Nov 30
- Work zoneSouthbound- Detour to the frontage road<br/>- Follow the marked detour<br/><br/><br/>Traffic is detoured to the frontage roads as bridge construction continues. Slow down and use caution travelling through the work zone. (US 83)until Nov 30
- Work zoneNorthbound- Detour to the frontage road<br/>- Follow the marked detour<br/><br/><br/>Traffic is detoured to the frontage roads as bridge construction continues. Slow down and use caution travelling through the work zone. (US 83)until Nov 30
- FlaggingNorthbound- Watch for flag personnel directing traffic.<br/><br/><br/> (US 83)until Nov 30
- FlaggingSouthbound- Watch for flag personnel directing traffic.<br/><br/><br/> (US 83)until Nov 30
- Work zoneNorthbound- Delays due to slow moving road repair operations.<br/>- Follow the marked detour<br/><br/><br/> (US 83)until Jan 31
- Road closedSouthbound- Motorists should expect delays.<br/>- Use alternate route<br/><br/><br/>CSJ 0086-01-101 For the Installation of Traffic Signals at Stone Ave & US83. Location #2 (US 83)until Nov 30
- Work zoneSouthbound- Delays due to slow moving road repair operations.<br/>- Follow the marked detour<br/><br/><br/> (US 83)until Jan 31
- FlaggingSouthbound- Follow the marked detour<br/>- Watch for flag personnel directing traffic.<br/><br/><br/>South bound US 83/84 traffic between County Road 154 and the US 83/84 split (Tuscola "Y") is shifted to the north bound roadbed to allow for construction of the new south bound roadway. The intersection of US 83 & US 84 is now an all-way stop with signals.Slow down through the work zone and obey the reduceduntil Dec 31
- Road closedNorthbound- Motorists should expect delays.<br/>- Use alternate route<br/><br/><br/>CSJ 0086-01-101 For the Installation of Traffic Signals at Stone Ave & US83. Location #2 (US 83)until Nov 30
- FlaggingNorthbound- Watch for flag personnel directing traffic.<br/><br/><br/>Traffic between the US 83/84 split (Tuscola "Y") and Tuscola is shifted to the north to allow for construction of the south half of the new roadway.Slow down through the work zone and obey the reduced speed limits.until Dec 31
- One lane, alternatingSouthbound- All traffic reduced to one lane, two-way traffic control in place, be prepared to stop.<br/><br/><br/>TRAFFIC LANES SHIFT.DAYTIME ONE-LANE, TWO TRAFFIC CONTROL. (US 83)until Nov 30
- FlaggingSouthbound- Watch for flag personnel directing traffic.<br/><br/><br/>Traffic between the US 83/84 split (Tuscola "Y") and Tuscola is shifted to the north to allow for construction of the south half of the new roadway.Slow down through the work zone and obey the reduced speed limits.until Dec 31
- One lane, alternatingNorthbound- All traffic reduced to one lane, two-way traffic control in place, be prepared to stop.<br/><br/><br/>TRAFFIC LANES SHIFT.DAYTIME ONE-LANE, TWO TRAFFIC CONTROL. (US 83)until Nov 30
- FlaggingNorthbound- Follow the marked detour<br/>- Watch for flag personnel directing traffic.<br/><br/><br/>South bound US 83/84 traffic between County Road 154 and the US 83/84 split (Tuscola "Y") is shifted to the north bound roadbed to allow for construction of the new south bound roadway. The intersection of US 83 & US 84 is now an all-way stop with signals.Slow down through the work zone and obey the reduceduntil Dec 31
- FlaggingSouthbound- Delays due to slow moving road repair operations.<br/>- Motorists should expect delays.<br/>- Watch for flag personnel directing traffic.<br/><br/><br/> (US 83)until Jan 31
- One lane, alternatingSouthbound- All traffic reduced to one lane, two-way traffic control in place, be prepared to stop.<br/>- Motorists should expect delays.<br/><br/><br/> (US 83)until Dec 31
- One lane, alternatingNorthbound- All traffic reduced to one lane, two-way traffic control in place, be prepared to stop.<br/>- Motorists should expect delays.<br/><br/><br/> (US 83)until Dec 31
Other Texas highways
From the Texas Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from TxDOT.
Driving US-83?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit