Wisconsin road construction · US-61
US-61 construction in Wisconsin today
Every WisDOT work zone on US-61 in Wisconsin today: lane closures, full closures, which direction and how long each lasts.
4 work zones · 2 full closures · updated every 15 minutes
- FlaggingNorthboundMainline Flagging Operation on US 61 NB from GREENWOOD RD to STENNER HILL. Daily from 11/02/2026 to 11/02/2026, 07:00 AM - 06:00 PM, Mfrom Mon, Nov 2, 8:00 AM, until Nov 2
- FlaggingNorthboundMainline Flagging Operation on US 61 NB from 2ND ST to PLUM VALLEY RD. Daily from 11/02/2026 to 11/02/2026, 07:00 AM - 06:00 PM, Mfrom Mon, Nov 2, 8:00 AM, until Nov 2
- Road closedSouthboundUSH 61 Traffic follow USH 61 SB, Use Exit 1 to STH 11, follow STH 11 EB, left turn to Entrance Ramp to NB USH 61, follow USH 61 NB to Exit 5 to Kieler, WI. Detour Distance: 9.7 Miles (US 61 SB)from Mon, Nov 2, 6:00 AM, until Nov 3
- Road closedSouthboundCTH H/HHH traffic shall follow Prism Lane CTH H/HHH NB to CTH H, turn right and travel EB to the NB USH 61 Entrance Ramp, follow USH 61 NB to Exit 8 Dickeyville, turn left following USH 61 WB, turn left to USH 61 SB Entrance Ramp. (US 61 SB)from Mon, Nov 2, 6:00 AM, until Nov 3
Other Wisconsin highways
From the Wisconsin Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from WisDOT.
Driving US-61?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit