Minnesota road construction · MN-65
MN-65 construction in Minnesota today
Every MnDOT work zone on MN-65 in Minnesota today: lane closures, full closures, which direction and how long each lasts.
11 work zones · 6 full closures · updated every 15 minutes
- Lanes closedNorthboundUtility Work, Right Turn Lane Closed, Shoulder Closed (MN 65)until Nov 18
- Road closedNorthboundClosed, Construction Work, Detour In Operation (MN 65)until Nov 7
- Road closedSouthboundClosed, Construction Work, Detour In Operation (MN 65)until Nov 7
- Work zoneNorthboundRoad Maintenance Operations, Work Zone Is Active (MN 65)until Aug 21
- Work zoneSouthboundRoad Maintenance Operations, Work Zone Is Active (MN 65)until Aug 21
- Road closedNorthboundClosed, Construction Work (MN 65)until Nov 7
- Road closedSouthboundClosed, Construction Work (MN 65)until Nov 7
- Road closedNorthboundClosed, Construction Work (MN 65)until Nov 7
- Road closedSouthboundClosed, Construction Work (MN 65)until Nov 7
- Lanes closedSouthboundConstruction Work, Reduced To One Lane (MN 65)from Mon, Nov 2, 10:00 AM, until Nov 4
- Lanes closedSouthboundConstruction Work, Reduced To One Lane, Shoulder Closed (MN 65)from Mon, Nov 2, 9:00 AM, until Nov 6
Other Minnesota highways
From the Minnesota Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from MnDOT.
Driving MN-65?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit