Minnesota road construction · US-65
US-65 construction in Minnesota today
Every MnDOT work zone on US-65 in Minnesota today: lane closures, full closures, which direction and how long each lasts.
2 work zones · 2 full closures · updated every 15 minutes
- Road closedSouthboundClosed, Railroad Crossing Closed, Detour In Operation, Local Access Only (US 65)until Aug 16
- Road closedNorthboundClosed, Railroad Crossing Closed, Detour In Operation, Local Access Only (US 65)until Aug 16
Other Minnesota highways
From the Minnesota Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from MnDOT.
Driving US-65?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit