Wisconsin road construction · WIS-124
WIS-124 construction in Wisconsin today
Every WisDOT work zone on WIS-124 in Wisconsin today: lane closures, full closures, which direction and how long each lasts.
2 work zones · 0 full closures · updated every 15 minutes
- Lanes closedNorthboundMainline Left Lane Closed on WIS 124 NB from SUMMIT AVE to TO BRIDGE ST NBfrom Mon, Nov 2, 8:00 AM, until Nov 3
- Lanes closedSouthboundMainline Left Lane Closed on WIS 124 SB from FROM BRIDGE ST SB to PARK ST/CTH J (BRIDGE CROSSING)from Mon, Nov 2, 8:00 AM, until Nov 3
Other Wisconsin highways
From the Wisconsin Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from WisDOT.
Driving WIS-124?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit