Wisconsin road construction · WIS-170
WIS-170 construction in Wisconsin today
Every WisDOT work zone on WIS-170 in Wisconsin today: lane closures, full closures, which direction and how long each lasts.
2 work zones · 0 full closures · updated every 15 minutes
- Work zoneEastboundMainline One Lane Road Temporary Signal on WIS 170 EB from RED CEDAR RIVER (BRIDGE CROSSING) to WIS 170 (TERMINI)until Nov 25
- Work zoneWestboundMainline One Lane Road Temporary Signal on WIS 170 WB from WIS 40 to PARK STuntil Nov 25
Other Wisconsin highways
From the Wisconsin Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from WisDOT.
Driving WIS-170?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit