Wisconsin road construction · WIS-40
WIS-40 construction in Wisconsin today
Every WisDOT work zone on WIS-40 in Wisconsin today: lane closures, full closures, which direction and how long each lasts.
6 work zones · 0 full closures · updated every 15 minutes
- Lanes closedNorthboundMainline Right Shoulder Closed on WIS 40 NB from BREMER AVE to COUNTY Muntil Nov 13
- FlaggingNorthboundMainline Flagging Operation on WIS 40 NB from WIS 40 SB (BEGIN DIVIDED) to COUNTY M. Daily from 04/06/2026 to 11/13/2026, 06:00 AM - 07:00 PM, Sun, M, T, W, Th, F, Satfrom Mon, Nov 2, 7:00 AM, until Nov 2
- FlaggingNorthboundMainline Flagging Operation on WIS 40 NB from WIS 40 SB (BEGIN DIVIDED) to COUNTY M. Daily from 04/06/2026 to 11/13/2026, 06:00 AM - 07:00 PM, Sun, M, T, W, Th, F, Satuntil Nov 1
- FlaggingSouthboundMainline Flagging Operation on WIS 40 SB from E BOUNDRY LINE RD to WIS 40 NB. Daily from 04/06/2026 to 11/13/2026, 06:00 AM - 07:00 PM, Sun, M, T, W, Th, F, Satuntil Nov 1
- Lanes closedSouthboundMainline Right Shoulder Closed on WIS 40 SB from E BOUNDRY LINE RD to PARK DRuntil Nov 13
- FlaggingSouthboundMainline Flagging Operation on WIS 40 SB from E BOUNDRY LINE RD to WIS 40 NB. Daily from 04/06/2026 to 11/13/2026, 06:00 AM - 07:00 PM, Sun, M, T, W, Th, F, Satfrom Mon, Nov 2, 7:00 AM, until Nov 2
Other Wisconsin highways
From the Wisconsin Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from WisDOT.
Driving WIS-40?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit