Wisconsin road construction · WIS-83
WIS-83 construction in Wisconsin today
Every WisDOT work zone on WIS-83 in Wisconsin today: lane closures, full closures, which direction and how long each lasts.
4 work zones · 0 full closures · updated every 15 minutes
- Lanes closedNorthboundMainline Right Shoulder Closed on WIS 83 NB from RACINE - WALWORTH CO LINE to WALWORTH - WAUKESHA CO LINEuntil Nov 25
- FlaggingNorthboundMainline Flagging Operation on WIS 83 NB from ILLINOIS-WISCONSIN STATE LINE to WIS 83 SB (BEGIN DIVIDED). Daily from 11/02/2026 to 11/05/2026, 08:00 AM - 03:00 PM, M, T, W, Thfrom Mon, Nov 2, 9:00 AM, until Nov 2
- Lanes closedNorthboundMainline Right Shoulder Closed on WIS 83 NB from OLD VILLAGE RD to OLD VILLAGE RD. Daily from 10/19/2026 to 11/27/2026, 07:00 AM - 04:00 PM, M, T, W, Th, F (excluding Sun, Sat)from Mon, Nov 2, 8:00 AM, until Nov 2
- FlaggingSouthboundMainline Flagging Operation on WIS 83 SB from WIS 83 NB (END DIVIDED) to 128TH ST. Daily from 11/02/2026 to 11/05/2026, 08:00 AM - 03:00 PM, M, T, W, Thfrom Mon, Nov 2, 9:00 AM, until Nov 2
Other Wisconsin highways
From the Wisconsin Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from WisDOT.
Driving WIS-83?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit