Iowa road construction · IA-21
IA-21 construction in Iowa today
Every Iowa DOT work zone on IA-21 in Iowa today: lane closures, full closures, which direction and how long each lasts.
1 work zone · 0 full closures · updated every 15 minutes
- Lanes open, work nearbyNorthboundBetween IA 92 (1 mile north of the Delta area) and County Road G29 (2 miles south of the What Cheer area). Road construction. Intermittent lane closure. Look out for flaggers. From 7:00AM CDT to 7:00PM CDT on weekdays and Saturday. Starting Monday at 7:00AM CDT until November 19, 2026 at about 7:00PM CDT. Comment: Fairfield RCE (641-469-4090) - Keokuk County (IA-21)from Mon, Nov 2, 7:00 AM, until Nov 2
Other Iowa highways
From the Iowa Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from Iowa DOT.
Driving IA-21?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit