Iowa road construction · US-218
US-218 construction in Iowa today
Every Iowa DOT work zone on US-218 in Iowa today: lane closures, full closures, which direction and how long each lasts.
3 work zones · 0 full closures · updated every 15 minutes
- Lanes open, work nearbyNorthboundBetween IA 92 (6 miles north of the Crawfordsville area) and Exit 239 (Iowa City). Road construction work is in progress. A lane is closed intermittently. Until November 3, 2026 at about 1:00PM CDT. Full schedule below: • April 27, 7:00AM - November 3, 1:00PM Comment: Fairfield RCE (641-469-4090) - Washington County (US-218)until Nov 3
- Lanes open, work nearbyNorthboundBetween County Road H14 (1 mile north of the Olds area) and County Road G36 (6 miles north of the Crawfordsville area). Road construction work is in progress. A lane is closed intermittently. Until November 12, 2026 at about 2:00PM CDT. Full schedule below: • September 22, 7:00AM - November 12, 2:00PM Comment: Fairfield RCE (641-469-4090) - Washington County (US-218)until Nov 12
- Lanes open, work nearbyNorthboundBetween Exit 192: County Road C57 (Janesville) and County Road C33 (6 miles south of the Plainfield area). Road construction work is in progress. The roadway is shared with opposing traffic. There is a width limit in effect. There is a weight limit in effect. There is an axle load limit in effect. Width limit 15'5". No vehicles over 156,000 lbs. Axle weight limit 20,000 lbs. Until December 11, 202 (US-218)until Dec 11
Other Iowa highways
From the Iowa Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from Iowa DOT.
Driving US-218?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit