Iowa road construction · IA-22
IA-22 construction in Iowa today
Every Iowa DOT work zone on IA-22 in Iowa today: lane closures, full closures, which direction and how long each lasts.
2 work zones · 0 full closures · updated every 15 minutes
- Lanes open, work nearbyEastboundBetween County Road W21 and IA 1 (near Wellman). Road construction. Intermittent lane closure. Look out for flaggers. Starting October 19, 2026 at 7:00AM CDT until November 19, 2026 at about 1:00PM CDT. Full schedule below: • October 19, 7:00AM - November 19, 1:00PM Comment: Fairfield RCE (641-469-4090) - Washington County (IA-22)until Nov 19
- Lanes open, work nearbyEastboundBetween County Road W66 (near Lone Tree) and IA 70 (1 mile east of the Nichols area). Road construction work is in progress. A lane is closed intermittently. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 10'0". Until November 12, 2026 at about 7:00PM CDT. Full schedule below: • April 27, 7:00AM - November 12, 7:00PM Comment: Fairfield RCE (641-46 (IA-22)until Nov 12
Other Iowa highways
From the Iowa Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from Iowa DOT.
Driving IA-22?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit