Iowa road construction · US-6
US-6 construction in Iowa today
Every Iowa DOT work zone on US-6 in Iowa today: lane closures, full closures, which direction and how long each lasts.
7 work zones · 0 full closures · updated every 15 minutes
- Lanes open, work nearbyEastboundBetween County Road W38 and I-380 (near Tiffin). Road construction. Temporary traffic lights. Height limit in effect. Height limit 15'0". Starting October 16, 2026 at 7:00AM CDT until November 16, 2026 at about 4:00PM CDT. Full schedule below: • October 16, 7:00AM - November 16, 4:00PM (US-6)until Nov 16
- Lanes open, work nearbyEastboundBetween IA 70 (1 mile east of the West Liberty area) and County Road X54 (near Atalissa). Road construction work is in progress. A lane is closed intermittently. Look out for flaggers. Until November 19, 2026 at about 1:00PM CDT. Full schedule below: • October 22, 12:00PM - November 19, 1:00PM Comment: Fairfield RCE (641-469-4090) - Muscatine County (US-6)until Nov 19
- Lanes open, work nearbyEastboundBetween I-280 and US 61 Business (Davenport). Night time construction work is in progress. A lane is closed intermittently. There is a width limit in effect. Width limit 11'0". From 8:00PM CDT to 6:00AM CDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Until November 19, 2026 at about 6:00AM CDT. Comment: Davenport RCE (800-262-5145) - Scott County (US-6)from Sun, Nov 1, 8:00 PM, until Nov 2
- Lanes closedWestboundBetween I-380 and Coral Ridge Avenue (Coralville). Road closed due to night time construction work. Detour in operation. Follow the Iowa DOT-recommended detour around the closure. See map for detour(s). Starting Sunday at 8:00PM CDT until November 2, 2026 at about 5:00AM CDT. Full schedule below: • November 1, 8:00PM - November 2, 5:00AM Comment: Cedar Rapids RCE (877-226-8110) - Johnson County (US-6)from Sun, Nov 1, 9:00 PM, until Nov 2
- Lanes closedEastboundBetween I-380 and Coral Ridge Avenue (Coralville). Road closed due to night time construction work. Detour in operation. Follow the Iowa DOT-recommended detour around the closure. See map for detour(s). Starting Sunday at 8:00PM CDT until November 2, 2026 at about 5:00AM CDT. Full schedule below: • November 1, 8:00PM - November 2, 5:00AM Comment: Cedar Rapids RCE (877-226-8110) - Johnson County (US-6)from Sun, Nov 1, 9:00 PM, until Nov 2
- Lanes open, work nearbyEastboundBetween County Road R16 (Clive) and Northwest 100th Street (Urbandale). Night time construction work. Intermittent lane closure. From 7:00PM CDT to 5:00AM CDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Starting tomorrow at 7:00PM CDT until December 1, 2026 at about 5:00AM CDT. Comment: Grimes RCE (800-251-2707) - Polk County (US-6)from Sun, Nov 1, 7:00 PM, until Nov 2
- Lanes closedEastboundBetween US 169 and County Road R16 (Adel). The left lane is closed due to road construction work. Until November 16, 2026 at about 6:00PM CDT. Full schedule below: • October 12, 7:00AM - November 16, 6:00PM Comment: Creston RCE (877-226-8109) - Dallas County (US-6)until Nov 16
Other Iowa highways
From the Iowa Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from Iowa DOT.
Driving US-6?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit