Iowa road construction · IA-48
IA-48 construction in Iowa today
Every Iowa DOT work zone on IA-48 in Iowa today: lane closures, full closures, which direction and how long each lasts.
1 work zone · 0 full closures · updated every 15 minutes
- Lanes open, work nearbyNorthboundBetween County Road H54 and US 34 (Red Oak). Road construction work is in progress. The roadway is shared with opposing traffic. There is a width limit in effect. There is a weight limit in effect. There is an axle load limit in effect. Width limit 9'4". No vehicles over 156,000 lbs. Axle weight limit 20,000 lbs. Until November 27, 2026 at about 6:00PM CDT. Full schedule below: • May 11, 8:00AM - (IA-48)until Nov 27
Other Iowa highways
From the Iowa Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from Iowa DOT.
Driving IA-48?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit