Iowa road construction · US-59
US-59 construction in Iowa today
Every Iowa DOT work zone on US-59 in Iowa today: lane closures, full closures, which direction and how long each lasts.
5 work zones · 0 full closures · updated every 15 minutes
- Lanes open, work nearbyNorthboundBetween I-80 (Avoca) and IA 44 (Harlan). Road construction. Intermittent lane closure. Pilot car in operation. Look out for flaggers. From 8:00AM CDT to 6:00PM CDT on weekdays. Starting October 21, 2026 at 8:00AM CDT until November 5, 2026 at about 6:00PM CDT. Comment: Creston RCE (877-226-8109) - Pottawattamie and Shelby Counties (US-59)from Mon, Nov 2, 8:00 AM, until Nov 2
- Lanes open, work nearbyNorthboundBetween I-80 and County Road F58 (near Corley). Road construction work is in progress. Look out for temporary traffic lights. There is a height limit in effect. There is a width limit in effect. Height limit 15'0". Width limit 17'0". Until December 24, 2026 at about 5:00PM CDT. Full schedule below: • June 27, 8:00AM - December 24, 5:00PM Comment: Creston RCE (877-226-8109) - Pottawattamie and Shel (US-59)until Dec 24
- Lanes open, work nearbyNorthboundBetween US 18 and the Minnesota Border; County Road A10 (21 miles north of the Sanborn area). Road construction. Intermittent lane closure. Pilot car in operation. Look out for flaggers. From 7:00AM CDT to 7:00PM CDT on weekdays. Starting October 22, 2026 at 7:00AM CDT until November 5, 2026 at about 7:00PM CDT. Comment: Cherokee RCE (712-225-5786) - O'Brien and Osceola Counties (US-59)from Mon, Nov 2, 7:00 AM, until Nov 2
- Lanes open, work nearbyNorthboundBetween US 20 (near Holstein) and County Road C66 (4 miles north of the Holstein area). Road construction. Intermittent lane closure. Pilot car in operation. Look out for flaggers. From 7:00AM CDT to 7:00PM CDT on weekdays. Starting tomorrow at 7:00AM CDT until November 12, 2026 at about 7:00PM CDT. Comment: Cherokee RCE (712-225-5786) - Ida County (US-59)from Mon, Nov 2, 7:00 AM, until Nov 2
- Lanes open, work nearbyNorthboundBetween IA 2 (near Shenandoah) and County Road J18 (6 miles north of the Shenandoah area). Road construction. Intermittent lane closure. Pilot car in operation. Look out for flaggers. From 8:00AM CDT to 6:00PM CDT on weekdays. Starting Tuesday at 8:00AM CDT until November 12, 2026 at about 6:00PM CDT. Comment: Creston RCE (877-226-8109) - Fremont and Page Counties (US-59)from Mon, Nov 2, 8:00 AM, until Nov 2
Other Iowa highways
From the Iowa Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from Iowa DOT.
Driving US-59?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit