Iowa road construction · US-67
US-67 construction in Iowa today
Every Iowa DOT work zone on US-67 in Iowa today: lane closures, full closures, which direction and how long each lasts.
4 work zones · 0 full closures · updated every 15 minutes
- Lanes open, work nearbySouthboundBetween County Road F33 (Le Claire) and Grant Street (Riverdale). Road construction. Intermittent lane closure. Starting October 19, 2026 at 7:00AM CDT until November 6, 2026 at about 7:00PM CDT. Full schedule below: • October 19, 7:00AM - November 6, 7:00PM Comment: Davenport RCE (800-262-5145) - Scott County (US-67)until Nov 6
- Lanes closedSouthboundBetween County Road F33 and I-80 (near Le Claire). The road is closed due to road construction work. A detour is in operation. Follow the Iowa DOT-recommended detour around the closure. See map for detour(s). Until December 30, 2026 at about 3:00PM CDT. Full schedule below: • March 2, 6:00AM - December 30, 3:00PM Comment: Scott County (US-67)until Dec 30
- Lanes open, work nearbyNorthboundBetween I-80 and County Road F33 (near Le Claire). Road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until December 30, 2026 at about 3:00PM CDT. Full schedule below: • March 2, 6:00AM - December 30, 3:00PM Comment: Scott County (US-67)until Dec 30
- Lanes closedSouthboundBetween McClellan Boulevard and Bridge Avenue (Davenport). The right lane is closed due to road construction work. Until November 13, 2026 at about 4:00PM CDT. Full schedule below: • October 19, 7:00AM - November 13, 4:00PM (US-67)until Nov 13
Other Iowa highways
From the Iowa Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from Iowa DOT.
Driving US-67?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit