Ohio road construction · I-275
I-275 construction in Ohio today
Every ODOT work zone on I-275 in Ohio today: lane closures, full closures, which direction and how long each lasts.
4 work zones · 0 full closures · updated every 15 minutes
- Lanes open, work nearbyNorthboundA bridge rehabilitation project on Branch Hill Miamiville Road over I-275. Traffic on I-275 will be maintained with shoulder closures and periodic lane closures. Branch Hill Miamiville Road is closed through mid-September 2026. (IR 275)until Aug 1
- Lanes closedEastboundA 16-foot height restriction will be in effect on the Branch Hill Miamiville Road bridges over I-275. Traffic on I-275 will be maintained through the work zone. (IR 275)until Nov 21
- Lanes closedWestboundA 16-foot height restriction will be in effect on the Branch Hill Miamiville Road bridges over I-275. Traffic on I-275 will be maintained through the work zone. (IR 275)until Nov 21
- Lanes open, work nearbySouthboundA bridge rehabilitation project on Branch Hill Miamiville Road over I-275. Traffic on I-275 will be maintained with shoulder closures and periodic lane closures. Branch Hill Miamiville Road is closed through mid-September 2026. (IR 275)until Aug 1
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving I-275?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit