Ohio road construction · US-127
US-127 construction in Ohio today
Every ODOT work zone on US-127 in Ohio today: lane closures, full closures, which direction and how long each lasts.
4 work zones · 0 full closures · updated every 15 minutes
- Lanes closedEastboundA resurfacing project on S.R. 73, between U.S. 127 at Seven Mile and the western corporation limit of Trenton. Work will begin Monday, April 20, with pavement repairs, and resurfacing will begin in mid to late May. Traffic will be maintained in one lane with the use of flaggers. (TRENTON OXFORD RD)until Nov 1
- Lanes closedNorthboundUS 127 between Seigrist Jutte Road and Sebastian Road will intermittently be reduced to a single lane from 7 a.m. to 7 p.m. through fall 2026. Traffic will be maintained by a flagging operation. Crews will be repairing and resurfacing the roadway.until Nov 16
- Lanes closedSouthboundUS 127 between Seigrist Jutte Road and Sebastian Road will intermittently be reduced to a single lane from 7 a.m. to 7 p.m. through fall 2026. Traffic will be maintained by a flagging operation. Crews will be repairing and resurfacing the roadway.until Nov 16
- Lanes closedNorthboundA pavement repair and resurfacing project on S.R. 503, between U.S. 127 at Seven Mile and the Preble County line. Traffic will be maintained in a minimum of one, 11-foot lane with the use of flaggers and/or traffic control devices. (WEST ELKTON RD)until Nov 1
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving US-127?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit