Ohio road construction · US-68
US-68 construction in Ohio today
Every ODOT work zone on US-68 in Ohio today: lane closures, full closures, which direction and how long each lasts.
3 work zones · 0 full closures · updated every 15 minutes
- Lanes closedNorthboundUS 68 between SR 55/Lewis B Moore Drive and Springfield Pike will be subject to lane restrictions from 7 a.m. to 5 p.m. starting Tuesday, August 18 through fall 2026. Traffic will be maintained by a flagging operation when necessary. Crews will be repairing the bridge. (SPRINGFIELD URBANA PIKE)until Nov 6
- Lanes closedNorthboundUS 68 between SR 55/Lewis B Moore Drive and Springfield Pike will be subject to lane restrictions from 7 a.m. to 5 p.m. starting Tuesday, August 18 through fall 2026. Traffic will be maintained by a flagging operation when necessary. Crews will be repairing the bridge.until Nov 6
- Lanes open, work nearbyNorthboundConstruction of safe pedestrian and bicycle connections b/t the Little Miami Scenic Trail and the new Shawnee Interceptive Education Center. (US68)until Jun 1
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving US-68?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit