Ohio road construction · I-71
I-71 construction in Ohio today
Every ODOT work zone on I-71 in Ohio today: lane closures, full closures, which direction and how long each lasts.
10 work zones · 3 full closures · updated every 15 minutes
- Road closedSouthboundThe I-70 westbound to I-71 southbound (flyover) ramp will close starting 10 p.m. Friday, October 30 through 5 a.m. Monday, November 2.until Nov 2
- Lanes closedNorthboundI-71 from the Ashland County line to SR 13 will have single lane closures for a resurfacing project. Nightly lane closures will begin Sunday, May 17 from 7:00 p.m. to 6:00 a.m. for resurfacing work. There will only be daytime lane closures, when necessary, but majority of daytime work will be along the shoulder and in the median. (IR 71)until Nov 6
- Lanes closedSouthboundI-71 from the Ashland County line to SR 13 will have single lane closures for a resurfacing project. Nightly lane closures will begin Sunday, May 17 from 7:00 p.m. to 6:00 a.m. for resurfacing work. There will only be daytime lane closures, when necessary, but majority of daytime work will be along the shoulder and in the median. (IR 71)until Nov 6
- Road closedSouthboundThe I-70 westbound to I-71 southbound (flyover) ramp will close starting 10 p.m. Friday, October 30 through 5 a.m. Monday, November 2. (IR71)until Nov 2
- Lanes closedNorthboundReplacement of the pedestrian bridge over I-71 and I-471, between VanMeter Street and Gilbert Avenue, and replacement of the pedestrian bridge over Gilbert Avenue (U.S. 22). The project also includes construction of a new shared use path bridge over I-71, I-471 and U.S. 22, and construction of a new stairway. Traffic on I-71 and I-471 will be maintained; however, Gilbert Avenue will be subject to (IR71 EXPY)until Dec 31
- Lanes closedEastboundThe I-77 northbound ramps to I-480 will have various lane restrictions through December. (RAMP FROM IR 71 TO IR 480)until Dec 1
- Road closedNorthboundAs part of the Brent Spence Bridge Corridor Project, the ramp from I-71 North to Second Street will be closed for demolition and reconstruction. The closure will go into effect July 16, 2026, and will remain in effect through late fall of 2028. Motorists will be detoured by way of I-75 North to the Fifth Street exit (Exit 1C) and Race Street to Second Street. (RAMP FROM IR 71 TO MR 8628 ELM ST)until Dec 16
- Lanes closedNorthboundThe I-71 northbound ramp to U.S. 36/SR 37 will be reduced to one lane starting Wednesday, April 8 through Fall 2026. (RAMP FROM IR 71 TO US 36)until Nov 15
- Lanes open, work nearbyWestboundThe I-71 northbound ramps to I-480 will have various lane restrictions through December. (RAMP FROM RA 18048 TO IR 480N)until Dec 1
- Lanes open, work nearbyWestboundI-71 northbound to I-480 westbound will be reduced to one lane beginning Thursday, April 2, through July 2028. (RAMP FROM RA 18048 TO IR 480N)until Dec 1
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving I-71?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit