Ohio road construction · SR-4
SR-4 construction in Ohio today
Every ODOT work zone on SR-4 in Ohio today: lane closures, full closures, which direction and how long each lasts.
8 work zones · 2 full closures · updated every 15 minutes
- Lanes closedNorthboundResurfacing on S.R. 4 (Springfield Pike), between Barron Drive and Sharon Road. Construction also includes paving S.R. 747 (Congress Avenue), from its junction with S.R. 4 to just north of Coral Avenue. Traffic will be maintained in a minimum of one lane in each direction. (CONGRESS AVE)until Nov 7
- Lanes closedSouthboundResurfacing on S.R. 4 (Springfield Pike), between Barron Drive and Sharon Road. Construction also includes paving S.R. 747 (Congress Avenue), from its junction with S.R. 4 to just north of Coral Avenue. Traffic will be maintained in a minimum of one lane in each direction. (CONGRESS AVE)until Nov 7
- Road closedNorthboundThe ramp from US 35 East and West to I-75 North will be closed overnight from 10 p.m. to 5 a.m. starting Sunday, November 1 through early Monday, November 2. Crews will be repairing the concrete wall along the ramp. (RAMP FROM US 35N TO SR 4)from Sun, Nov 1, 10:00 PM, until Nov 2
- Lanes closedNorthboundResurfacing on S.R. 4 (Springfield Pike), between Barron Drive and Sharon Road. Construction also includes paving S.R. 747 (Congress Avenue), from its junction with S.R. 4 to just north of Coral Avenue. Traffic will be maintained in a minimum of one lane in each direction. (SPRINGFIELD PIKE)until Nov 7
- Lanes closedSouthboundResurfacing on S.R. 4 (Springfield Pike), between Barron Drive and Sharon Road. Construction also includes paving S.R. 747 (Congress Avenue), from its junction with S.R. 4 to just north of Coral Avenue. Traffic will be maintained in a minimum of one lane in each direction. (SPRINGFIELD PIKE)until Nov 7
- Lanes closedNorthboundSR 4 from Bogart Road to Perkins Ave. will have single lane closures for a resurfacing project. Traffic will be maintained by flaggers.until Sep 30
- Lanes closedSouthboundSR 4 from Bogart Road to Perkins Ave. will have single lane closures for a resurfacing project. Traffic will be maintained by flaggers.until Sep 30
- Road closedNorthboundThe ramp from US 35 East and West to I-75 North will be closed overnight from 10 p.m. to 5 a.m. starting Sunday, November 1 through early Monday, November 2. Crews will be repairing the concrete wall along the ramp. (SR 4)from Sun, Nov 1, 10:00 PM, until Nov 2
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving SR-4?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit