Ohio road construction · US-52
US-52 construction in Ohio today
Every ODOT work zone on US-52 in Ohio today: lane closures, full closures, which direction and how long each lasts.
7 work zones · 0 full closures · updated every 15 minutes
- One lane, alternatingNorthboundBridge replacement project on U.S. 52 over Redoak Creek between U.S. 68 and Cherry Street. (CHERRY ST)until Dec 31
- One lane, alternatingWestboundBridge replacement project on U.S. 52 over Redoak Creek between U.S. 68 and Cherry Street. (S 2ND ST)until Dec 31
- One lane, alternatingEastboundBridge replacement project on U.S. 52 over Redoak Creek between U.S. 68 and Cherry Street. (S 2ND ST)until Dec 31
- Lanes closedWestboundA joint repair project on U.S. 52, between the I-275 interchange in Hamilton County and Beckjord Road in Clermont County. Traffic will be maintained in a minimum of one, 11-foot lane in either direction. (US 52)until Nov 21
- Lanes closedEastboundA joint repair project on U.S. 52, between the I-275 interchange in Hamilton County and Beckjord Road in Clermont County. Traffic will be maintained in a minimum of one, 11-foot lane in either direction. (US 52)until Nov 21
- Lanes closedWestboundA joint repair project on U.S. 52, between the I-275 interchange in Hamilton County and Beckjord Road in Clermont County. Traffic will be maintained in a minimum of one, 11-foot lane in either direction. (US 52)until Nov 21
- Lanes closedEastboundA joint repair project on U.S. 52, between the I-275 interchange in Hamilton County and Beckjord Road in Clermont County. Traffic will be maintained in a minimum of one, 11-foot lane in either direction. (US 52)until Nov 21
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving US-52?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit