Ohio road construction · US-35
US-35 construction in Ohio today
Every ODOT work zone on US-35 in Ohio today: lane closures, full closures, which direction and how long each lasts.
8 work zones · 3 full closures · updated every 15 minutes
- Road closedSouthboundAll southbound lanes are being detoured (except for the ramp to westbound U.S. 35). (N BRIDGE ST)until Nov 27
- Road closedSouthboundAll southbound lanes are being detoured (except for the ramp to westbound U.S. 35). (N BRIDGE ST)until Nov 27
- Road closedEastboundTraffic exiting the shopping centers south of U.S. 35 can access U.S. 35 east by going south on Bridge Street to East Main Street and east on Main Street to U.S. 35 (RAMP FROM SR 159 N BRIDGE ST TO US 35)until Nov 30
- Lanes closedEastboundTwo lanes of traffic are maintained on the ramp to northbound SR 159. (RAMP FROM US 35 TO SR 159 N BRIDGE ST)until Nov 27
- Lanes closedEastboundIntermittent lane/shoulder closures for sign replacements (US 35)until Nov 30
- Lanes closedWestboundTree trimming project on U.S. 35 between the Ross County line and Chillicothe Pike. (US 35)until Nov 6
- Lanes closedEastboundTree trimming project on U.S. 35 between the Ross County line and Chillicothe Pike. (US 35)until Nov 6
- Lanes closedWestboundLane closure for bridge deck repair. 17 ft. width restriction in place. (US 35)until Nov 2
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving US-35?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit