Ohio road construction · SR-122
SR-122 construction in Ohio today
Every ODOT work zone on SR-122 in Ohio today: lane closures, full closures, which direction and how long each lasts.
3 work zones · 0 full closures · updated every 15 minutes
- Lanes closedEastboundAs part of a resurfacing and bridge repair project, S.R. 122 is reduced to one lane at the bridge over Elk Creek, near Hursh Road. Traffic will be maintained with temporary traffic signals. (MIDDLETOWN EATON RD)until Nov 15
- Lanes closedWestboundA resurfacing and bridge repair project on S.R. 122, between the Preble County line and the Great Miami River at Middletown. Traffic will be maintained in one lane by flaggers during daytime hours. (MIDDLETOWN EATON RD)until Nov 21
- Lanes closedEastboundA resurfacing and bridge repair project on S.R. 122, between the Preble County line and the Great Miami River at Middletown. Traffic will be maintained in one lane by flaggers during daytime hours. (MIDDLETOWN EATON RD)until Nov 21
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving SR-122?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit