Ohio road construction · SR-125
SR-125 construction in Ohio today
Every ODOT work zone on SR-125 in Ohio today: lane closures, full closures, which direction and how long each lasts.
2 work zones · 0 full closures · updated every 15 minutes
- Lanes closedEastboundA resurfacing project on S.R. 125, between S.R. 222 North and Kelli Lane at Bethel. Traffic will be maintained in a minimum of one lane in either direction, during hours of operation, daily from approximately 7 a.m. to 8 p.m. (SR 125)until Nov 15
- Lanes closedWestboundA resurfacing project on S.R. 125, between S.R. 222 North and Kelli Lane at Bethel. Traffic will be maintained in a minimum of one lane in either direction, during hours of operation, daily from approximately 7 a.m. to 8 p.m. (W PLANE ST)until Nov 15
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving SR-125?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit