Ohio road construction · SR-241
SR-241 construction in Ohio today
Every ODOT work zone on SR-241 in Ohio today: lane closures, full closures, which direction and how long each lasts.
2 work zones · 2 full closures · updated every 15 minutes
- Road closedNorthboundBeginning on Friday, October 16, SR 241 between Shuffel St. and Willowdale Lake Ave. will be closed through fall 2027 for a bridge replacement and pavement reconstruction. The truck detour will be SR 241 to I-77 to SR 687. The local detour will be Shuffel Rd. to Frank Ave. to Strausser St. (WALES AVE)until Sep 30
- Road closedSouthboundBeginning on Friday, October 16, SR 241 between Shuffel St. and Willowdale Lake Ave. will be closed through fall 2027 for a bridge replacement and pavement reconstruction. The truck detour will be SR 241 to I-77 to SR 687. The local detour will be Shuffel Rd. to Frank Ave. to Strausser St. (WALES AVE)until Sep 30
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving SR-241?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit