Ohio road construction · SR-510
SR-510 construction in Ohio today
Every ODOT work zone on SR-510 in Ohio today: lane closures, full closures, which direction and how long each lasts.
3 work zones · 1 full closure · updated every 15 minutes
- One lane, alternatingNorthboundState Route 510, between Clyde and Buck Creek, will experience lane restrictions for resurfacing through November. (N MAIN ST)until Nov 30
- One lane, alternatingSouthboundState Route 510, between Clyde and the Ohio Turnpike, will be reduced to one lane for resurfacing through early November. Traffic maintained by temporary traffic signals with traffic alternating one way. (N SR 510)until Nov 7
- Road closedSouthboundState Route 510, between State Route 412 and U.S. Route 6, will be closed for full-depth pavement reconstruction beginning Monday, August 10. Local residential and business access will be maintained by flaggers for northbound when approaching from SR 412. No southbound traffic will be permitted from US 6. Commercial detour: SR 412 to US 20 to US 6 and vise versa. (N SR 510)until Dec 1
Other Ohio highways
From the Ohio Department of Transportation's work zone feed (WZDx), as Orbit keeps it. Closures can change at short notice; follow the signs on the road. Some work zones come with few details from ODOT.
Driving SR-510?Orbit warns you about work zones ahead on your side of the road, and goes quiet when drivers are getting through at speed.
See Orbit SI →
Orbit